BIM Quality Control Checklist.

A model that looks right is not always right. This checklist covers what to check before a model is shared, reviewed or built from, and where software can do the checking for you.

1. Set Up

The Model Is Placed And Organised Correctly.

  • All disciplines share the same origin, units and level names, so the models line up when combined
  • Elements are on the right level and the right floor
  • Each file is exported to IFC with the settings the project agreed, and the schema version is the one the team uses
  • File and version names follow the project's convention, so everyone knows which is current
2. Data

Elements Carry The Information People Rely On.

  • Types, names and classifications follow the project standard
  • Properties and quantities that downstream users need are present and filled in
  • Materials are named consistently, so quantities can be grouped and carbon or cost can be derived
  • No element is duplicated, within a file or across files
3. Coordination

Disciplines Fit Together.

  • The combined model is checked for clashes on every new version, not only at milestones
  • Intended overlaps, such as a pipe through its own sleeve, are separated from the clashes that need action
  • Every real clash has an owner, a priority and a status, and is followed to closure
  • Each version is compared with the last, so it is clear what was resolved and what is new
4. Review And Record

Decisions Are Tied To Versions.

  • Reviewers comment on the element, not on a screenshot
  • Each review round ends in a recorded decision, with who, when and why
  • Issues travel back to the designers in an open format with a viewpoint
5. As-Built

The Finished Work Matches The Design.

  • A laser scan of the finished work is compared with the model
  • A tolerance is agreed first, so "off" has one meaning for everyone
  • Elements that cannot be verified are listed, not ignored
Who Checks

Quality Is Checked At Several Levels.

Model Authors

Check their own model before every issue: set-up, naming, properties, duplicates.

BIM Coordinator

Checks the federated model: clashes, versions, coordinates and what changed.

Discipline Leads

Check the engineering: sizes, clearances, fire ratings and access for maintenance.

Site And Quality Teams

Check the built work against the model and record defects until they are closed.

When

When To Run Each Check.

What To CheckWhy
Before Each Model IssueSet-up, naming, properties, duplicatesErrors are cheapest to fix at their source
Each Coordination CycleClashes, version changes, open issuesKeeps the clash list short and current
Before Stage Sign-OffThe full checklist and the client's information requirementsEach stage starts from a known, clean model
During ConstructionScan against model, defects, changes on siteFinds deviations while they can still be corrected
At HandoverAs-built model, asset data, manuals and certificatesThe owner receives records that match the building
Writing Rules

Turn Requirements Into Checks.

Most projects state their information requirements in a document, often following ISO 19650. Each requirement can be rewritten as a rule a model can be checked against: every door has a fire rating, every space has a name and number, every pipe has a system name.

Write the rule, the tolerance and the person responsible for each check, and record agreed exceptions. A checklist that people can run in minutes on every version catches far more than a thorough review held once at the end.

Doing It In SpaceDesignX

Which Items The Platform Checks For You.

SpaceDesignX runs the coordination checks (section 3) on every version, recognises duplicated elements, keeps issues and decisions tied to versions (section 4), and compares a scan with the model against a tolerance you set (section 5). Setup and data standards (sections 1 and 2) stay with the project's BIM execution plan.

Questions

Common Questions.

What Does SDX TrueSpace Check?

SDX TrueSpace covers quality from the model to the finished building. Every model version is checked for geometry clashes, elements duplicated across files, and element data that is missing or inconsistent. Findings are classed, scored and assigned to an owner. As-built checks compare the model with a laser scan of the real building.

Can We Set Our Own Quality Checks?

Yes. Checks and thresholds are settings that your own experts edit. They decide what counts as Major, which findings become issues and who the issues go to.

How Does LiDAR Scan Vs Model Verify What Was Built?

SpaceDesignX aligns a laser scan (LAS, LAZ or E57) with the model and measures every element against the scanned surfaces. Each element is marked Matches, Off, Not Found or Not Scanned against a tolerance your team sets, and Off elements show the distance and direction.

Can We See Whether Quality Improves Between Model Versions?

Yes. Comparing two runs shows which clashes are new, which were resolved and which are unchanged, and the Analytics page shows clashes per version and issues over time.